Custom Shower Tile Installation in Orlando: The Hidden Work
A luxury shower is the hardest tile job in a house, and the parts that decide whether it lasts are the parts you never see once the tile goes on.
Read the article →
You asked three companies to quote the same tile job and the numbers came back thousands of dollars apart. Same room, same tile, same square footage. That gap is confusing, and it is also the most useful information you have.
Almost always, what changed between those bids is not the price of the work. It is the amount of work. This is the guide we wish every homeowner had before hiring anybody in this trade, ourselves included. We are a family-owned Orlando tile company, more than 20 years in Central Florida homes, licensed and insured, and usually not the low bid. We would rather you hire the right installer than hire us by accident.
Put the three quotes side by side and cover the bottom number. The difference between a cheap bid and a careful one is rarely the tile, which costs about the same wherever it is bought. It is the work you never see once the job is done.
Here is what tends to be missing from the low quote:
Once you can see those six items, the bids usually explain themselves. Our breakdown of custom tile installation costs in Orlando goes through the math line by line.
Ask all three the same questions and compare the answers, not the confidence behind them.
Ask for a license number and look it up yourself. Then ask for a certificate of insurance sent directly from their agent, not a photo of a card, showing general liability and workers compensation, with your name and property address as certificate holder.
If an uninsured worker is hurt in your home, or a supply line gets hit during demolition, whose policy pays becomes a very real question. Any established company can produce that certificate in a day.
A modest deposit is normal. Something in the range of 10 to 30 percent to hold the date and buy material is typical, then progress payments tied to milestones and a final payment after you walk the finished job.
What should give you pause: a large cash deposit before anything is scheduled, a request for most of the money up front, cash only with no invoice, pressure to sign today, and any number handed over without a written scope. Good installers are booked weeks out.
A quote that says master bath tile, $9,400 is not a quote. It is a number. Ask for the scope in writing: rooms and square footage, tile and setting materials named, prep and leveling described, waterproofing system named, layout, grout color, edge treatment at every corner and transition, who hauls debris, and how many days it takes.
Two bids that both spell that out can be compared honestly. A bid that will not put it in writing is the one most likely to grow once the floor is open.
Ask for photos of their own recent work, close up rather than wide room shots. Look at four things:
Our own project gallery is there for this kind of inspection.
None of these prove a bad installer alone. Two or three together are worth walking away from: no physical address or license number anywhere, no photos of their own finished work, a firm price given over the phone without seeing the space, refusal to put scope in writing, and pressure to decide immediately.
The cheapest quote is not automatically wrong. On a straight-lay porcelain floor in a bedroom or hallway, over a slab that is already sound and flat, a lean crew doing simple work well is a fair deal, and we will tell you so.
Where the low bid gets expensive is showers, large-format tile over an uneven slab, and pattern work. A herringbone or chevron layout lives or dies on layout time and cutting, and savings there come out of the labor that makes it look right. Our post on herringbone and chevron installation shows where those hours go.
Everything above applies to us. Ask who will be in your house, what membrane we use, whether we flood test, how flat we will get your slab, and how we plan to finish your outside corners. Read our scope before you look at our number.
If our answers are better than the other two, hire us. If not, hire the company whose answers were better. Either way you end up with a floor you are not redoing in five years.
For a written scope and a real quote, call us at 407-538-1155 or reach us through our contact page. We come out, measure, check the slab, and price the job for free.
Usually the scope differs, not the price of the tile. Cheaper bids often leave out substrate leveling, shower waterproofing, movement joints, or proper edge profiles, which are the parts you cannot see once the job is done. Compare what each quote includes before you compare the totals.
Ask who is on site each day, whether the crew is employed or subcontracted, what waterproofing system they use and whether they flood test, how flat they will get the substrate, and how outside corners will be finished. Also ask what happens if a tile is damaged after the job. Those answers separate installers faster than price does.
Something in the range of 10 to 30 percent to hold the date and buy material is typical, followed by progress payments tied to milestones and a final payment after a walkthrough. A large cash deposit before anything is scheduled, or a request for most of the money up front, is worth questioning. So is any price given without a written scope attached.
Sometimes. On a straight-lay floor over a slab that is already sound and flat, a lean crew doing simple work well can be a fair deal. On showers, large-format tile over an uneven slab, or pattern work like herringbone, the savings usually come out of prep and waterproofing, and that gets expensive later.
Keep Reading
A luxury shower is the hardest tile job in a house, and the parts that decide whether it lasts are the parts you never see once the tile goes on.
Read the article →Large format tile reads as calm and almost continuous, and it is the least forgiving material in the trade. Here is what actually goes into getting it right.
Read the article →Herringbone, chevron, basketweave, hexagon mosaics: which patterns earn their price, why the labor costs more, and how to vet an installer before you commit.
Read the article →